 === 3.1.1. Receiving Sales Orders === === 3.1.1. Receiving Sales Orders ===
 The requirements for the manufacturing process in most businesses are driven by sales orders. The Sales Order form is extended by Produmex Manufacturing with a new field ‘MRP Date’. The MRP Date calculated by the planning logic of Produmex Manufacturing is the earliest possible date to accomplish/​fulfill the sales order. The requirements for the manufacturing process in most businesses are driven by sales orders. The Sales Order form is extended by Produmex Manufacturing with a new field ‘MRP Date’. The MRP Date calculated by the planning logic of Produmex Manufacturing is the earliest possible date to accomplish/​fulfill the sales order.
 +
 +//Please note: Only the Bill of Materials of the product is considered during the MRP Date calculation. The Bill of Materials of lower level assembly materials are not considered during the calculation.//​
  
 {{ :​implementation:​bxmanuf:​functional:​quickstart:​qs_sales_order.png |Sales Order}} {{ :​implementation:​bxmanuf:​functional:​quickstart:​qs_sales_order.png |Sales Order}}
Line 105: Line 107:
  
 === 3.1.2. Receiving Sales Quotations === === 3.1.2. Receiving Sales Quotations ===
-The earliest fulfillment date can also be calculated for Sales Quotations. The form is extended by Produmex Manufacturing with a new //’MRP Date’// field. Click on the button next to the MRP Date field. ​The planning logic of Produmex Mnaufactuirng will calculate the earliest possible date to fulfill the sales quotation. ​+The earliest fulfillment date can also be calculated for Sales Quotations. The form is extended by Produmex Manufacturing with a new //’MRP Date’// field. Click on the button next to the MRP Date field. ​Starting from the current date, the planning logic of Produmex Mnaufactuirng will calculate the earliest possible date to fulfill the sales quotation. ​ 
 + 
 +//Please note: Only the Bill of Materials of the product is considered during the MRP Date calculation. The Bill of Materials of lower level assembly materials are not considered during the calculation.//​
  
 If the //'​Advanced MTO Recommendation'//​ option is enabled on the [[implementation:​manufacturing:​confguide#​mto_tab|MTO tab]] of Produmex Manufacturing settings, a //’Sales Quotation Simulation Parameters’//​ form will open. If the //'​Advanced MTO Recommendation'//​ option is enabled on the [[implementation:​manufacturing:​confguide#​mto_tab|MTO tab]] of Produmex Manufacturing settings, a //’Sales Quotation Simulation Parameters’//​ form will open.
implementation/manufacturing/quickstart.txt · Last modified: 2018/06/05 09:48 by csuhaa