User Tools

Site Tools


implementation:manufacturing:jscp_config

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
implementation:manufacturing:jscp_config [2018/03/22 11:52]
csuhaa 18.1
implementation:manufacturing:jscp_config [2019/09/18 08:12] (current)
vise
Line 1: Line 1:
 ====== 1. Configurations ====== ====== 1. Configurations ======
-===== 1.1. Configurations on Produmex ​Mnaufacturing ​settings =====+===== 1.1. Configurations on Produmex ​Manufacturing ​settings =====
 ==== 1.1.1. Allocation dimensions ==== ==== 1.1.1. Allocation dimensions ====
 With default configurations only the work center dimension of the allocation is used in the MRP, therefore the other two dimensions cannot be displayed on the Job Scheduling Control Panel. To enable multidimension allocation, go to the [[implementation:​manufacturing:​confguide#​mrp_tab | MRP tab of the Produmex Manufacturing Settings]] and check the //‘Use multidimension allocation’//​ option. ​ With default configurations only the work center dimension of the allocation is used in the MRP, therefore the other two dimensions cannot be displayed on the Job Scheduling Control Panel. To enable multidimension allocation, go to the [[implementation:​manufacturing:​confguide#​mrp_tab | MRP tab of the Produmex Manufacturing Settings]] and check the //‘Use multidimension allocation’//​ option. ​
implementation/manufacturing/jscp_config.txt · Last modified: 2019/09/18 08:12 by vise