vise sections 3 and 4.1 upgraded to v18.5
Line 36: Line 36:
  
 ===== 3. Work Center/​Resource Features ===== ===== 3. Work Center/​Resource Features =====
-Define the work center features on this form. A feature is a kind of capability a work center has. A feature ​is used by the resource scheduling logic to find the appropriate resource for a manufacturing operation. Add the feature code and description to the grid.+A feature is a kind of capability a work center has and it is used by the resource scheduling logic to find the appropriate resource for a manufacturing operation. ​
  
-{{ implementation:​manufacturing:​functional:​setup:​wc_feature.png?nolink |Work Center Features}}+1. Define the work center features on this form by adding the feature code and a description to //Code// and //Name// columns of the grid.
  
-To see which work centers are assigned for a feature, select the line of the feature and click on the Resources’ button. To define cost amounts for a feature, select the line of the feature then click on the Cost Amounts’ button. Select the cost type then specify the amount of each phrase.+{{ :​implementation:​manufacturing:​functional:​setup:​1._resource_features.png|Resource Features}} 
 + 
 +2. To see which work centers are assigned for a feature, select the line of the feature and click on the ''​Resources'' ​button. To define cost amounts for a feature, select the line of the feature then click on the ''​Cost Amounts'' ​button. Select the cost type then specify the amount of each phrase
 + 
 +3. It is also possible to define SAP time-based resources for the features in the //SAP Resource// column. For more information on defining SAP time-based resources please consult with section [[implementation:​manufacturing:​time_resources|Using Time-Based Resources in Work Centers and PDC]].
  
 <WRAP round box> <WRAP round box>
-If the multi-dimensional allocation strategy is enabled on the [[implementation:​manufacturing:​confguide#​mrp_tab|MRP tab]] of Produmex Manufacturing settings, features for supplementary resources can be defined too. The form title will be changed to ‘Resource Features’ and an additional //Resource Type// column will be displayed. On this column select the resource type of the feature. ​+4. If the multi-dimensional allocation strategy is enabled on the [[internal:​manufacturing:​confguide#​mrp_tab|MRP tab]] of Produmex Manufacturing settings, features for supplementary resources can be defined too. The form title will be changed to ‘Resource Features’ and an additional //Resource Type// column will be displayed. On this column ​you can select the resource type of the feature. ​
 </​WRAP>​ </​WRAP>​
  
Line 60: Line 64:
 A work center is an individual production area. It is a section of a production facility where all tasks associated with a particular process (such as assembling, painting, welding) are performed. A work center may represent a single machine, a group of machines, a single person, a group of persons. ​ A work center is an individual production area. It is a section of a production facility where all tasks associated with a particular process (such as assembling, painting, welding) are performed. A work center may represent a single machine, a group of machines, a single person, a group of persons. ​
  
-Define the available shifts/​capacity slots for the work center by selecting a Shift Plan for it. The selected bin location will be the default bin for material issues and product receipts ​ during PDC bookings. ​Defining a profit center ​for the work center is optional+1. Define the available shifts/​capacity slots for the work center by selecting a Shift Plan for it. \\ 
 +2. Defining a profit center for the work center is optional. \\ 
 +3. The selected bin location will be the default bin for material issues and product receipts during PDC bookings. ​\\ 
 +4. It is also possible to define SAP time-based resources ​for work centers in the //SAP Resource// column. For more information on defining SAP time-based resources please consult with section [[implementation:​manufacturing:​time_resources|Using Time-Based Resources in Work Centers and PDC]].
  
 The job scheduler will only take into account work centers marked as ‘Active’. The job scheduler will only take into account work centers marked as ‘Active’.
Line 66: Line 73:
 Work centers marked as //​‘Unlimited’//​ have boundless capacities. Since there is no capacity constraint, multiple operations can be scheduled to the same time. Work centers marked as //​‘Unlimited’//​ have boundless capacities. Since there is no capacity constraint, multiple operations can be scheduled to the same time.
  
-{{ implementation:​manufacturing:​functional:​setup:​workcenter.png?​nolink ​|Work Center}}+{{ :implementation:​manufacturing:​functional:​setup:​2._work_center.png |Work Center}}
  
 //​**Resource Feature** // \\ //​**Resource Feature** // \\