19.1. Configuring SAP Time-based Resources
1. Run SAP B1 as administrator and start the Produmex Manufacturing add-on.
2. Make sure that you remove SRF files by navigating to:
Tools >Produmex Manufacturing>SRF File Management>Remove SRF Files.
3. Open Resource Master Data and fill in the (4) Unit of Measure Text and (5) Time per Resource Units fields, then (6) configure the Resource Std Cost values as follows.
4. The Unit of Measure Text is a text field the value of which depends on the value of the Time per Resource Units field. Its value can be:
- h (for hour) or
- m (for minute) or
- s (for second).
5. The value of the Time per Resource Units field is exactly 1 and needs to be set as follows:
- 1:00:00 (hourly based) or
- 0:01:00 (per-minute) or
- 0:00:01 (per-second).
6. Configure the Resource Std Cost values on the General tab. This way, when the resource consumption is issued to the production orders, SAP calculates the actual journal entry and its cost values.