===== 19.1. Configuring SAP Time-based Resources ===== 1. Run SAP B1 as administrator and start the Produmex Manufacturing add-on. 2. Make sure that you **remove SRF files** by navigating to: \\ Tools >Produmex Manufacturing>SRF File Management>Remove SRF Files. {{ :implementation:manufacturing:functional:time-based:1.remove_srf.png |Removing SRF files}} 3. Open //Resource Master Data// and fill in the (4) **Unit of Measure Text** and (5) **Time per Resource Units** fields, then (6) configure the **Resource Std Cost** values as follows. 4. The **Unit of Measure Text** is a text field the value of which depends on the value of the **Time per Resource Units** field. Its value can be: * h (for hour) or * m (for minute) or * s (for second). 5. The value of the **Time per Resource Units** field is exactly 1 and needs to be set as follows: * 1:00:00 (hourly based) or * 0:01:00 (per-minute) or * 0:00:01 (per-second). 6. Configure the **Resource Std Cost** values on the //General// tab. This way, when the resource consumption is issued to the production orders, SAP calculates the actual journal entry and its cost values. {{ :implementation:manufacturing:functional:time-based:2.resource_md_config.png |Resource Master Data}}