User Tools

Site Tools


implementation:manufacturing:pdc_simplejob

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

implementation:manufacturing:pdc_simplejob [2017/06/09 14:41]
csuhaa created
implementation:manufacturing:pdc_simplejob [2017/11/24 09:36] (current)
csuhaa pdc extended configuration
Line 1: Line 1:
-====== 2.7. Simple Job module ======+======2.7. Simple Job module======
 With the Simple Job module, the user can start and complete a job and a setup at one step.  With the Simple Job module, the user can start and complete a job and a setup at one step. 
  
 +=====2.7.1. Start Job=====
 {{ :​implementation:​manufacturing:​pdc:​simple:​startjob.png?​direct |Start Job}} {{ :​implementation:​manufacturing:​pdc:​simple:​startjob.png?​direct |Start Job}}
  
-The default work center is the work center defined for the terminal on the ‘PDC ​Extended ​Configuration’ ​form. To disable the default work center, set the ‘Work Center Ignore’ option to ‘Yes’. When there is a default work center, bookings can be created only for operations with the feature assigned to the default work center. ​+The default work center is the work center defined for the terminal on the [[implementation:​manufacturing:​pdc_terminal_config#​pdc_terminal_configuration|‘PDC ​Terminal ​Configuration’ ​user table]]. To disable the default work center, set the ‘Work Center Ignore’ option to ‘Yes’ ​for the employee on the [[implementation:​manufacturing:​pdc_terminal_config#​pdc_extended_configuration|‘PDC Extended Configuration’ user table]]. When there is a default work center, bookings can be created only for operations with the feature assigned to the default work center.
  
-Add the DocEntry-LineNumber identifier to the ‘Operation’ field. The default work center is not mandatory. If there is more than one work center with the same feature as the default, the user can complete the operation on any of those work centers.+Add the //DocEntry-LineNumber// identifier to the ‘Operation’ field. ​
  
-To erase the content of the fields, press the ‘Clear’ button. \\+If there is a default work center, the work center field will be populated automatically. The user cannot modify the work center if the default work center is mandatory. The default work center is mandatory in the following cases: 
 +  * The employee and/or the work center has no configurations set on the [[implementation:​manufacturing:​pdc_terminal_config#​pdc_extended_configuration|‘PDC Extended Configuration’ user table]] and the ‘PDC Modifiable WC for Start’ option is disabled on the [[implementation:​manufacturing:​confguide#​thin_client_tab|Thin Client tab]] of Produmex Manufacturing settings. 
 +  * The ’Work Center Modification’ option is disabled on the [[implementation:​manufacturing:​pdc_terminal_config#​pdc_extended_configuration|‘PDC Extended Configuration’ user table]] for the employee and/or work center. 
 +Otherwise the work center is not mandatory and the user can select an alternative work center. 
 + 
 +To erase the content of the modifiable ​fields, press the ‘Clear’ button. \\
 To log out as the current employee, press the ‘Logout’ button. \\ To log out as the current employee, press the ‘Logout’ button. \\
-To see the Admin screen, press the ‘Admin’ button. For more information about the Admin function please see: [[implementation:​manufacturing:​pdc_pdc#​admin|2.2.9. Admin]] ​\\ +To see the Admin screen, press the ‘Admin’ button. For more information about the Admin function please see: [[implementation:​manufacturing:​pdc_pdc#​admin|2.2.9. Admin]]  
-To complete the operation, press the ‘Done’ button.+ 
 +Press the ‘Done’ button ​to proceed.
  
 {{ :​implementation:​manufacturing:​pdc:​simple:​completejob.png?​direct |Complete Job}} {{ :​implementation:​manufacturing:​pdc:​simple:​completejob.png?​direct |Complete Job}}
  
-To create setup bookings too, tick the ‘Setup’ box. The box is only active if there is setup time defined for the operation. Scan the destination Bin Location or enter its code. Then enter the completed and rejected quantity. Press the ‘Done’ button to proceed.+=====2.7.2. Complete Job===== 
 +Scan the destination Bin Location or enter its code. \\ 
 +The default Bin Location is the Bin Location defined for the employee/​work center on the [[implementation:​manufacturing:​pdc_terminal_config#​pdc_extended_configuration|‘PDC Extended Configuration’ user table]]. If there is no default bin location defined for the employee/​work center on the [[implementation:​manufacturing:​pdc_terminal_config#​pdc_extended_configuration|‘PDC Extended Configuration’ user table]], then the default bin location is the bin location defined for the work center. 
 + 
 +To create setup bookings too, tick the ‘Setup’ box. The box is only active if there is setup time defined for the operation. Scan the destination Bin Location or enter its code.  
 + 
 +Then enter the completed and rejected quantity. ​When the user enters the completed/​rejected quantity, the duration is automatically calculated. 
 +  * If setup time is defined for the operation and the ‘Setup’ checkbox is checked, the duration is calculated as {(Setup base quantity + Operation base quantity) * (Completed quantity + Rejected quantity)}. 
 +  * If there is no setup time defined for the operation and/or the ‘Setup’ checkbox is not checked, the duration is calculated as {Operation base quantity * (Completed quantity + Rejected quantity)}.  
 +After the Duration field is filled, the system also calculates the Start time as {Current Date/Time – Duration}. 
 + 
 +If the //‘Manual Job Duration’//​ option is enabled on the [[implementation:​manufacturing:​pdc_terminal_config#​pdc_extended_configuration|‘PDC Extended Configuration’ user table]], the user can enter the duration. When the user enters or modifies the duration, the system recalculates the Start time. Please note: The completed quantity will not be recalculated based on the duration. 
 + 
 +If the //​’Comment Visible’//​ option is enabled on the [[implementation:​manufacturing:​pdc_terminal_config#​pdc_extended_configuration|‘PDC Extended Configuration’ user table]], an additional Commend field is displayed on the screen.  
 + 
 +Press the ‘Done’ button to proceed.
  
 When there are materials linked to the operation with a milestone, receive the materials. Please see: [[implementation:​manufacturing:​pdc_pdc#​materials|2.2.7.Materials]] When there are materials linked to the operation with a milestone, receive the materials. Please see: [[implementation:​manufacturing:​pdc_pdc#​materials|2.2.7.Materials]]
Line 21: Line 43:
 When there is a by-product linked to the operation or the operation is the last one on the production order and there is a milestone set for the product, receive the (by-)products too. Please see: [[implementation:​manufacturing:​pdc_pdc#​product_and_by-products|2.2.6.Products]] When there is a by-product linked to the operation or the operation is the last one on the production order and there is a milestone set for the product, receive the (by-)products too. Please see: [[implementation:​manufacturing:​pdc_pdc#​product_and_by-products|2.2.6.Products]]
  
-Because the user does not start the job manually, the booked time cannot be measured. ​Therefore the system ​creates ​the booking ​based on the following:​ + 
-  * completed quantity and rejected quantity +**Operation Details** \\ 
-  * setup (if booked) and job time defined on the Production Order Operation Details form.+Because the user does not start the job manually, the booked time cannot be measured. ​The system ​will automatically create the ‘Start Setup’, ‘Completed Setup’, ‘Start Job’ and ‘Completed Job’ bookings. The Posting Time of the Complete Job booking ​is the time when the PDC booking was created. The Posting Time of the ‘Start Setup’, ‘Completed Setup’, ‘Start Job’ bookings is calculated backwards.
  
 {{ :​implementation:​bxmanuf:​pdc:​pdc:​simplejob:​simplejob_bookings.png?​direct |Operation Details}} {{ :​implementation:​bxmanuf:​pdc:​pdc:​simplejob:​simplejob_bookings.png?​direct |Operation Details}}
  
-The system will automatically create the ‘Start Setup’, ‘Completed Setup’, ‘Start Job’ and ‘Completed Job’ bookings. The posting time will be calculated backwards. 
implementation/manufacturing/pdc_simplejob.txt · Last modified: 2017/11/24 09:36 by csuhaa